False Ceiling
Azuri Resorts
Azuri Resorts
Project Description:
Twins Maintenance Ltd. was commissioned to install a durable cement board false ceiling at Azuri Resorts. Designed to withstand the tropical climate, the cement board ceiling offered both longevity and style. The installation provided a clean, modern look while also addressing the need for moisture resistance and durability in the resort’s high-humidity environment. The finished ceiling seamlessly blended with the resort's elegant architecture, enhancing the overall aesthetic of the space.
Key Project Details:
Client: Azuri Resorts
Service Provided: Cement Board False Ceiling Installation
Completion Time: 3 Days
Materials Used: Cement Board, Metal Framing, Moisture-Resistant Coating
Challenges: Ensuring proper installation for long-term moisture resistance in a tropical environment and achieving a smooth, seamless finish.
Special Features: Durable, weather-resistant cement board for high humidity areas, sleek modern design with a clean, smooth surface finish.